LAHomework Sign in
Pasadena, CA 91105 · Tamarac Dr

390 Tamarac Dr

Built 1953 · 2,065 sq ft
LOT 5,119 SQ FT · 3 STRUCTURES · APN 5709-014-019Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1953
Living area
2,065 sqft
Lot size
5,119 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5709-014-019

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2012
Expected 2032 to 2042From the 2012 permit
20262035
HVACOn record 2014
Expected 2029 to 2034From the 2014 permit
20262035
Water heaterOn record 2010
Usually done by 2025From the 2010 permit

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 46 homes on Tamarac Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on fileElectrical: Install 50Amp 240Volt Circuit In Garage For Ev Charger
  • 2020
    permit on fileBathrooms: Bathroom Remodel
  • 2017
    permit on filePlumbing: Replace Main Drain Line/Replace Kitchen Sink
  • 2014
    permit on fileHeating & cooling: Replacing Hvac Unit
  • 2012
    permit on fileHeating & cooling: Install Ventilation Fan And Appliance Vent
  • 2012
    permit on fileElectrical: Install Electrical Services For House Remodel
  • 2012
    permit on filePlumbing: Install Plumbing Fixtures For House Remodel
  • 2012
    permit on fileKitchen: Kitchen & Bathroom Remodle (Non Structural Changes)
  • 2012
    permit on fileRoof: Tear Off And Re Roof House & Garage W/Class A Shingle Co And Smoke Alarm Required
  • 2011
    permit on fileElectrical: Upgrade Electrical Services To 200 Amp
  • 2010
    permit on fileWater heater: Tankless Water Heater Installation
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2008
    permit on fileHeating & cooling: Relocate Fau From Closet To Attic
  • 2004
    permit on fileGeneral remodel: Drainage & Waterproofing At North Side Of Residence Foundation
  • 2004
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2001
    permit on fileWater heater: Relocate Hot Water Heater To Exterior Of Residence
  • 1996
    permit on filePlumbing: Replace Exist. Interior Piping W/Copper

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2025
  • 2029
    HVAC replacementExpected 2029 to 2034