LAHomework Sign in
Palmdale, CA 93591 · 162nd St E

38933 162nd St E

Built 1986 · 1,250 sq ft
LOT 29,262 SQ FT · 1 STRUCTURE · APN 3074-008-016Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1986
Living area
1,250 sqft
Lot size
29,262 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
3074-008-016

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 78 homes on 162nd St E →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on file, unconfirmedSolar: Install 26 Canadian Solar 395 Watt Modules, 26 Enphase Microinverters, And Main Service Panel, 200A Rated, (Separate Permit) 1-Ph, 3-W, 240V
  • 2024
    permit on file, unconfirmedElectrical: Main Service Panel, 200A Rated, 1-Ph, 3-W, 240V
  • 2023
    permit on file, unconfirmedElectrical: Electric For Ac Hook Up Disconnect. 5 Ton Coil Change Out Like For Like. 110 Btus Furnace Change Out In Closet Like For Like.
  • 2023
    permit on file, unconfirmedHeating & cooling: 5 Ton Ac Relocation To Right Side Yard. Ac Electrical Hook Up Disconnect. 5 Ton Coil Change Out Like For Like. 110 Btus Furnace Change Out In Closet Like For Like.
  • 2022
    permit on fileSolar: Roof Mounted Solar 3.20Kw Consisting Of 8 Modules And 8 Microinverters.

Manage this home to schedule a service or to update the timeline.