LAHomework Sign in
Los Angeles, CA 90008 · Westside Ave

3890 Westside Ave

Built 1940 · 1,960 sq ft
LOT 9,056 SQ FT · 2 STRUCTURES · APN 5034-002-052Lot Structure
0 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1940
Living area
1,960 sqft
Lot size
9,056 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5034-002-052

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterOn record 2023
Expected 2033 to 2038From the 2023 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 83 homes on Westside Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedKitchen: Eplan. Interior And Exterior Remodel (E) Kitchen, Dining Room, Living Room And Closet Including New Flooring And Finishes.
  • 2025
    permit on fileBathrooms: (2)Bathroom Remodel For Residential Buildings (No Structural Changes) Mechanical, Electrical And Plumbing Included
  • 2024
    permit on fileElectrical: Remove Existing Grounding That Is Not Install Properly. Install Grounding By Bonding The Two Ground Rods And Main Cold Water Line, Install Quad Breakers To Eliminate Double Lug In. Replace All Circuit Breakers That Are Not The Same Brand As The Main Panel, Provide A Trench Approx' 14' Long, Replace
  • 2024
    permit on fileHeating & cooling: Change Out Heat Pump Hvac Unit. "Comply With Department Order Effective Date11/10/2023. Permit Will Expire 30 Days From Issuance Date". Allpermits Shall Be For The Same Time Period Limitation. If
  • 2024
    permit on fileHeating & cooling: Condenser And Air Handler Changeout
  • 2023
    permit on fileRoof: "Comply With Department Order Effective Date11/10/2023. Permit Will Expire 30 Days From Issuance Date". (12) Window And (25)Door Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Wind
  • 2023
    permit on fileElectrical: New Electrical Meter Box Located At 3890 Westside Ave And Subpanel Located At Detached Garage. Adding Power For Front Gate. "Comply With Department Order Effective Date11/10/2023. Permit Will Expire 30 Days From Issuance Date"
  • 2023
    permit on fileWater heater: Install A New Tankless Water Heater And Repipe Fixture "Comply With Department Order Effective Date 11/10/2023. Permit Will Expire 30 Days From Issuance Date"

Manage this home to schedule a service or to update the timeline.