LAHomework Sign in
Glendale, CA 91208 · El Lado Dr

3861 El Lado Dr

Built 1950 · 2,180 sq ft
LOT 16,436 SQ FT · 1 STRUCTURE · APN 5617-009-019Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1950
Living area
2,180 sqft
Lot size
16,436 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
5617-009-019

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2003
Expected 2023 to 2033From the 2003 permit
20262035
HVACOn record 2005
Usually done by 2025From the 2005 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 44 homes on El Lado Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on filePool: Remove Main Drain. Replace With Pool Sweeper.Ncludes Trades No Change To Shell
  • 2005
    permit on fileHeating & cooling: (1) 3-15 H.P. - (1) Electrical A/C & Compressor Added
  • 2003
    permit on fileRoof: Material: Tile 5.6 Lb. Class A - No. Of Squares: 27 Sqs - Tear Of Existing (Y/N): Y - Existing No. Of Layers: 2 - New Sheathing (Y/N): Y - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced She

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2025
  • Now
    Roof replacementExpected 2023 to 2033