LAHomework Sign in
Altadena, CA 91001 · Lilac Canyon Ln

3833 Lilac Canyon Ln

Built 1999 · 4,853 sq ft
LOT 8,489 SQ FT · 1 STRUCTURE · APN 5863-029-020Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1999
Living area
4,853 sqft
Lot size
8,489 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
5
Home type
Single-family
Parcel (APN)
5863-029-020

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2019 to 2029From build year 1999
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 17 homes on Lilac Canyon Ln →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on fileElectrical: Install (N) Tesla Powerwall
  • 2020
    permit on fileSolar: Batter Backup System For (E) Solar. (N) Tesla Battery Backup (Ess). (N) Tesla Backup Gateway 200A. (N) 400A Load Center. (N) 125A Critical Load Center. (N)125A Generation Load Center. (N) Meter Disconnect (Panel Upgrade) (N) 200A Bus (N) 200A Main Breaker.
  • 2020
    permit on file, unconfirmedHeating & cooling: Replace 80,000 Btu Furnace, 5 Ton (16 Seer) Ac Unit & Coil.
  • 2020
    permit on fileElectrical: Install (N) Tesla Powerwall, (N) Tesla Gateway

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2019 to 2029