LAHomework Sign in
Glendale, CA 91214 · Beechglen Dr

3733 Beechglen Dr

Built 1958 · 1,796 sq ft
LOT 9,569 SQ FT · 1 STRUCTURE · APN 5607-013-023Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1958
Living area
1,796 sqft
Lot size
9,569 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5607-013-023

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2005
Expected 2025 to 2035From the 2005 permit
20262035
HVACOn record 2007
Expected 2022 to 2027From the 2007 permit
20262035
Water heaterOn record 2023
Expected 2033 to 2038From the 2023 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 15 homes on Beechglen Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileWater heater: Remove Existing Water And Replace With New 50 Gallon Water Heater.
  • 2019
    permit on fileGeneral remodel: Seismic Retrofit Per La Dbs Standard Plans E/Q Hazard Reduction In (E) Wood Frame Residece.
  • 2013
    permit on fileWater heater: 1 Water Heater
  • 2007
    permit on fileHeating & cooling: (1) 100,000 Btu Or Less, (1) 3-15 H.P., (1) New Gas System, (1) Electrical
  • 2005
    permit on fileRoof: Residential Reroof As Follows:- - - This Is A Change Of Roofing Material (Y/N):N - Proposed Roofing Material:Class A - Squares (100 Sf) Being Installed:40Sqs - Tear Off Existing (Y/N):Y - Existing Layers Of Roofing:1 - New Sheathing Being Installed (Y/N):N - High Fire Hazard Zone (Y/N):N - - Note: A

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementExpected 2022 to 2027
  • Now
    Roof replacementExpected 2025 to 2035