LAHomework Sign in
Glendale, CA 91214 · Fairesta St

3731 Fairesta St

Built 1948 · 875 sq ft
LOT 5,605 SQ FT · 1 STRUCTURE · APN 5603-021-045Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1948
Living area
875 sqft
Lot size
5,605 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
5603-021-045

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2001
Expected 2021 to 2031From the 2001 permit
20262035
HVACOn record 2020
Expected 2035 to 2040From the 2020 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 138 homes on Fairesta St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on fileSolar: Solar Installation Of Roof Mounted Pv Solar: 4.25Kw, 10 Modules With 10 Micro-Inverters
  • 2020
    permit on fileHeating & cooling: New A/C System, Kitchen Hood, And Bathroom Fan.
  • 2020
    permit on fileRoom addition: 699 Sq Ft Split Level Addition To Rear Of Existing Sfd Consisting Of New Kitchen New Mastr Bedroom With Bath And Closet Demo Unpermitted Bonus Room In Rear
  • 2001
    permit on fileRoof: Material: Class A - No. Of Squares:16 Sqs - Tear Of Existing (Y/N):Y - New Sheathing (Y/N):Y - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2021 to 2031