LAHomework Sign in
Los Angeles, CA 91423 · Longridge Ave

3727 Longridge Ave

Built 2002 · 7,226 sq ft
LOT 43,898 SQ FT · 2 STRUCTURES · APN 2385-008-046Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2002
Living area
7,226 sqft
Lot size
1.01 acres
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
6
Bathrooms
7
Home type
Single-family
Parcel (APN)
2385-008-046

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2022 to 2032From build year 2002
20262035
HVACWorth a look now
Usually done by 2022From build year 2002
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 213 homes on Longridge Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileSolar: (Eplan) $0 Fees Due Per Assembly Bill 1414. Pv1 Pc For Installation Of Roof Mounted Solar Panels. Pv System Includes 58 Modules With 58 Microinverters And 1 Combiner Box Connected To Existing Main Service Panel. System Size Is 20.59Kw Dc/14.5Kw Ac.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2022
  • Now
    Roof replacementExpected 2022 to 2032