LAHomework Sign in
Los Angeles, CA 90032 · Locke Ave

3723 Locke Ave

Built 1922 · 1,801 sq ft
LOT 7,483 SQ FT · 3 STRUCTURES · APN 5306-011-041Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1922
Living area
1,801 sqft
Lot size
7,483 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
2
Home type
Duplex (2 units)
Parcel (APN)
5306-011-041

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 63 homes on Locke Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileBathrooms: Remodel Ex. Sfd. Create New Full Bathroom. "Comply With Department Order Effective Date 10/14/2024. Permit Will Expire 30 Days From Issuance Date".
  • 2026
    permit on fileKitchen: (1) Kitchen/ (1) Bathroom Remodel For Residential Buildings (No Structural Changes)."Comply With Department Order Effective Date10/14/2024. Permit Will Expire 30 Days From Issuance Date".
  • 2025
    permit on filePlumbing: Remodel Kitchen And Bathroom With No Structural Changes
  • 2025
    permit on fileHeating & cooling: Obtain Permit For Ac
  • 2024
    permit on fileElectrical: Electrical Panel 100 Amps Replacement/Check; Total Connected Load Not To Exceed 400Amps "Comply With Department Order Effective Date10/14/2024. Permit Will Expire 30 Days From Issuance Date". Allpermits Shall Be For The Same Time Period Limitation. Ifadditional Assistance Is Needed, Please Call Insp
  • 2024
    permit on fileElectrical: Electrical 200Amp Panel Replacement/Check; Total Connected Load Not To Exceed 400Amps"Comply With Department Order Effective Date10/14/2024. Permit Will Expire 30 Days From Issuance Date". Allpermits Shall Be For The Same Time Period Limitation. Ifadditional Assistance Is Needed, Please Call Inspect
  • 2020
    permit on file, unconfirmedElectrical: Upgrade Existing Panel To 200 Amps New Panel
  • 2020
    permit on fileElectrical: Upgrade A New Panel From 120 To 200Amps
  • 2014
    permit on file, unconfirmedElectrical: Electrical Permit · SUNSHINE AIR CONDITIONING INC
  • 2013
    permit on fileElectrical: Electrical Permit · SUNSHINE AIR CONDITIONING INC

Manage this home to schedule a service or to update the timeline.