LAHomework Sign in
Santa Monica, CA 90402 · 24th St

371 24th St

Built 1931 · 2,880 sq ft
LOT 17,305 SQ FT · 2 STRUCTURES · APN 4278-007-023Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1931
Living area
2,880 sqft
Lot size
17,305 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
3
Home type
Single-family
Parcel (APN)
4278-007-023

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2020
Expected 2040 to 2050From the 2020 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 102 homes on 24th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileRoom addition: Remodel Of Existing Pool To Install New Shell Inside Existing Pool Shell, Addition Of New Spa And New Pool Cover.
  • 2026
    permit on fileSolar: Installation Of 7.38Kw Photovoltaic System.
  • 2024
    permit on file, unconfirmedSolar: Unit B: New Two-Story Accessory Dwelling Unit And Attached Garage. Photovoltaic System Installation. [Adu 970 S/F. Garage: 333 S/F. Stairwell 57 S/F]
  • 2024
    permit on file, unconfirmedElectrical: Install A Temporary Power Pole In On The Exterior Of The South Wall. 200 Amp 120/240V 1P 4W Temporary Power Pole (23Bld-0840/22Bld-3675)
  • 2021
    permit on file, unconfirmedSolar: Installation Of 11.07 Kw Dc, 10.07 Kw Ac Cec Photovoltaic System Mounted On Roof And Consisting Of 27 Modules.
  • 2020
    permit on fileRoof: Re-Roof - Tearing Off An Existing Wood Shake Roof (Approximately 48 Squares) And Install Cedur Synthetic Composite Cedar Shake Roof.

Manage this home to schedule a service or to update the timeline.