LAHomework Sign in
Los Angeles, CA 90065 · Division St

3701 Division St

Built 2002 · 2,244 sq ft
LOT 8,500 SQ FT · 1 STRUCTURE · APN 5462-025-016Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2002
Living area
2,244 sqft
Lot size
8,500 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
5462-025-016

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACWorth a look now
Usually done by 2022From build year 2002
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 325 homes on Division St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing (23) Squares.Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). Forresidential Roof Replacement > Of The Total Roof Area, Apply Cool Roof Product Labeled And C
  • 2022
    permit on fileKitchen: (1) Kitchen Remodel For Residential Buildings (No Structural Changes). Combined With Plumbingreplace Drywall (No New Walls Added) For Single Family Dwellings And Duplexes Only."Comply With Department Order Effective Date09/03/2021. Permit Will Expire 30 Days From Issuance Date".

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2022