LAHomework Sign in
Glendale, CA 91208 · Valihi Way

3607 Valihi Way Unit B

Built 1952 · 2,531 sq ft
LOT 8,844 SQ FT · 1 STRUCTURE · APN 5613-002-008Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1952
Living area
2,531 sqft
Lot size
8,844 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
3
Home type
Triplex (3 units)
Parcel (APN)
5613-002-008

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2001
Expected 2021 to 2031From the 2001 permit
20262035
HVACOn record 2005
Usually done by 2025From the 2005 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 13 homes on Valihi Way →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2005
    permit on fileHeating & cooling: 1 Fau Up To 100000Btu, 1 Motor Up To 3Hp, 1 Connection To A Gas System
  • 2005
    permit on fileElectrical: 1 Branch Circuit, 1 Distribution Panel 16 Spaces, 4 Motors
  • 2001
    permit on fileRoof: Material: Class A, Light Weight Tile - No. Of Squares: 30 Sqs - Tear Of Existing (Y/N): Y - Existing No. Of Layers: - New Sheathing (Y/N): N - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2025
  • Now
    Roof replacementExpected 2021 to 2031