LAHomework Sign in
Los Angeles, CA 90026 · Bellevue Ave

3604 Bellevue Ave

Built 1916 · 1,218 sq ft
LOT 5,174 SQ FT · 1 STRUCTURE · APN 5401-009-041Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1916
Living area
1,218 sqft
Lot size
5,174 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Duplex (2 units)
Parcel (APN)
5401-009-041

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2022
Expected 2037 to 2042From the 2022 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 146 homes on Bellevue Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on file, unconfirmedGeneral remodel: Replace Damaged Wood Framing (Less Than 10%). Same Size, Spacing, Type.
  • 2022
    permit on fileGeneral remodel: Add Sill Plate Anchor Bolts, Add Plywood To Cripple Walls (If Existing), And Replace Foundation Per L.A. City Standard Plan #1 (Earthquake Hazard Reduction Per Chapter 92 Of The Los Angeles Building Code). (Houses, Residential Buildings Up To 3 Stories And Up To 4 Units).
  • 2022
    permit on file, unconfirmedHeating & cooling: The Previous Owner Built A Trellis That Is In Good Condition, Sturdy, And Never Gave Us Any Problems. We'Ve Never Had Any Problems With It In The 5 Years We'Ve Owned The Property. The Inspector Suggested That We Get A Permit For It.
  • 2022
    permit on fileHeating & cooling: We Had A Split A/C Installed By A Company In 2016. We Were Never Informed That We Needed A Permit To Get It Installed. Upon Inspection By The Housing And Community Investment Department, We Were Asked To Get This Permitted. The A/C Has Worked Really Well - We'Ve Never Had Problems With It. Tenants A

Manage this home to schedule a service or to update the timeline.