LAHomework Sign in
La Puente, CA 91744 · Richburn Ave

360 Richburn Ave

Built 1960 · 3,154 sq ft
LOT 6,047 SQ FT · 1 STRUCTURE · APN 8726-016-023Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1960
Living area
3,154 sqft
Lot size
6,047 sqft
Structures on lot
1
Bedrooms
6
Bathrooms
3
Home type
Single-family
Parcel (APN)
8726-016-023

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 61 homes on Richburn Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedHeating & cooling: R8 Ducts (7 Supply / 0 Return)
  • 2025
    permit on file, unconfirmedGeneral remodel: Install 750 Sqft Of R30 Blown In Insulation In Attic
  • 2024
    permit on file, unconfirmedHeating & cooling: (1) 3 Ton Heat Pump Condenser Changeout On Roof Contractor/Owner To Verify Accuracy Of Line Items Prior To Final Inspection, Additional Fees May Apply
  • 2023
    permit on fileSolar: Residential Install Of 11 Modules Roof Mounted Pv Solar Panels (N) (01) Enphase Encharge-10T-1P-Na Battery
  • 2023
    permit on file, unconfirmedSolar: Derate: (E) 200A Main Breaker To Be Derated To (N) 150A To Allow Backfeed Of (E) 35A+(N) 40A=75A (N) 125A Solar Load Center

Manage this home to schedule a service or to update the timeline.