LAHomework Sign in
Glendale, CA 91204 · W Garfield Ave

359 W Garfield Ave

Built 1921 · 1,413 sq ft
LOT 5,120 SQ FT · 3 STRUCTURES · APN 5696-018-013Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1921
Living area
1,413 sqft
Lot size
5,120 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
2
Home type
Duplex (2 units)
Parcel (APN)
5696-018-013

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2010
Expected 2030 to 2040From the 2010 permit
20262035
HVACOn record 2022
Expected 2037 to 2042From the 2022 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 42 homes on W Garfield Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on fileHeating & cooling: 1 Ton 12,000 Btu, Ductless Mini Split.
  • 2022
    permit on fileElectrical: 200Amp Service Panel
  • 2022
    permit on fileRoom addition: Garage Conversion To An Adu. 223 Sf.
  • 2010
    permit on filePlumbing: Change Of Contractor From Ali Boukhari To United Firm Construction
  • 2010
    permit on fileElectrical: Change Of Contractor From Ali Boukhari To United Firm Construction
  • 2010
    permit on filePlumbing: Change Of Contractor From Ali Boukhari To United Firm Construction -
  • 2010
    permit on fileGeneral remodel: Change Of Contractor From Ali Boukhari To United Firm Construction
  • 2010
    permit on fileHeating & cooling: Change Of Contractor From Ali Boukhari Zakaria To United Firm Construction -
  • 2010
    permit on fileElectrical: Change Of Contractor From Ali Boukhari To United Firm Construction
  • 2010
    permit on fileGeneral remodel: Change Of Contractor From Ali Boukhari Zakaria To United Firm Construction
  • 2010
    permit on fileGeneral remodel: Propose Covered Patio W/ 3 Sides Open (12--0" X 25--0" =300 Sf). To Rear Of Front Unit.
  • 2010
    permit on fileBathrooms: Convert An Existing Closet Into 2Nd Bath. - (Trades Pulled Under Seperate Permits)
  • 2010
    permit on fileGeneral remodel: To Replace 8 New Window & To Remove (E) Damaged Wood Siding To Replace (N) Wood Siding W/Plywood
  • 2010
    permit on fileRoof: Residential Reroof As Follows:- Class A Back House - - Estimated Cost Of Re-Roof: 3000 - This Is A Change Of Roofing Material (Y/N): N - Proposed Roofing Material: Comp Shingle - Squares (100 Sf) Being Installed: 10 Sqs - Tear Off Existing (Y/N): Y - Existing Layers Of Roofing: 2 - New Sheathing Bei
  • 2010
    permit on fileElectrical: 4 Branch Circuits, 1 125A Service
  • 2010
    permit on fileHeating & cooling: One Appliance Vent
  • 2010
    permit on fileKitchen: Interior Remodeling Drywall Insulation, Kitchen Remodeling Bathroom Remodeling. No Exiterior Changes No Movement Of Walls, Fixtures Same Locations.
  • 2010
    permit on fileHeating & cooling: One Fau Up To 100,000 Btu, One Appliance Vent, One 3-15 Hp A/C One Electrical A/C & Compressor And One New Gas System
  • 2010
    permit on fileKitchen: Kitchen Remodel, Bath Room Remodel. Fixtures Same Location No Movement Of Walls, No Exterior Changes.
  • 2010
    permit on filePlumbing: 6 Fixtures, One Bathroom Repipe
  • 2010
    permit on filePlumbing: 4 Fixutres And One Repipe Bathroom 1 Bath Room

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2030
    Roof replacementExpected 2030 to 2040