LAHomework Sign in
Pasadena, CA 91107 · Brandon St

3564 Brandon St

Built 1924 · 1,656 sq ft
LOT 5,432 SQ FT · 1 STRUCTURE · APN 5754-020-009Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1924
Living area
1,656 sqft
Lot size
5,432 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
3
Home type
Single-family
Parcel (APN)
5754-020-009

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2022
Expected 2037 to 2042From the 2022 permit
Water heaterOn record 2022
Expected 2032 to 2037From the 2022 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 95 homes on Brandon St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on fileRoom addition: Convert Garage 370 Sf To Adu And Permit Unpermitted 150 Sf Addition To Adu (One Bedroom And One Bathroom)
  • 2022
    permit on fileWater heater: Plmb To Convert Garage 370 Sf To Adu And Permit Unpermitted 150 Sf Addition To Adu (One Bedroom And One Bathroom). Install Tankless Water Heater.
  • 2022
    permit on file, unconfirmedPlumbing: Sewer For Adu
  • 2022
    permit on fileElectrical: Elec To Convert Garage 370 Sf To Adu And Permit Unpermitted 150 Sf Addition To Adu (One Bedroom And One Bathroom). 400 Amp Double Gang (200A Subpanel For Adu And 200A For House)
  • 2022
    permit on fileHeating & cooling: Mech To Convert Garage 370 Sf To Adu And Permit Unpermitted 150 Sf Addition To Adu (One Bedroom And One Bathroom)
  • 2019
    permit on fileElectrical: Upgrade Electrical Panel To 200 Amps

Manage this home to schedule a service or to update the timeline.