LAHomework Sign in
Los Angeles, CA 90065 · Canyon Vista Dr

352 Canyon Vista Dr

Built 1928 · 1,776 sq ft
LOT 7,566 SQ FT · 1 STRUCTURE · APN 5465-017-005Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1928
Living area
1,776 sqft
Lot size
7,566 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5465-017-005

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 46 homes on Canyon Vista Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileRoom addition: Addition (12 Sf) On First Floor And Interior Remodel To (E) Sfd On 1St Floor To Dining And Living Room, Create (N) Powder Room, Relocate Laundry Room And Kitchen. Replace Windows And Doors.
  • 2025
    permit on fileElectrical: 200 Amp Temp Power Pole
  • 2025
    permit on fileElectrical: Panel Upgrade
  • 2021
    permit on fileGeneral remodel: Add Sill Plate Anchors Bolts, Cripple Wall Plywood And Replace Foundation Per L.A. City Std. Plan #1(Eq Hazard Reduction Per Chapter 92).
  • 2021
    permit on fileGeneral remodel: Voluntary Seismic Upgrade. Install Anchor Bolts On Slab Per Plan. Repair 2 Foundation Cracks Per Plan.

Manage this home to schedule a service or to update the timeline.