LAHomework Sign in
Monrovia, CA 91016 · E El Sur St

345 E El Sur St

Built 1948 · 1,292 sq ft
LOT 6,458 SQ FT · 2 STRUCTURES · APN 8513-009-008Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1948
Living area
1,292 sqft
Lot size
6,458 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
8513-009-008

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2023
Expected 2038 to 2043From the 2023 permit
Water heaterOn record 2023
Expected 2033 to 2038From the 2023 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 36 homes on E El Sur St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileElectrical: Permit Is For A 3 Gang Main Panel Only 2 Meters Are Permitted, One For The Main House And One For The Detached Adu. Once The Jadu Is Converted To An Adu With Approval From Drp And Dpw The 3Rd Meter Can Be Used For The New Attached Adu.
  • 2024
    permit on filePlumbing: Connect Adu To Public Sewer
  • 2024
    permit on filePlumbing: Connect Adu To Public Sewer
  • 2023
    permit on fileBathrooms: Demo 310 Sf (E) Room And 68 Sf (E) Attached Storage. Converting 255 Sf Of Sfr To Adu And Add 145 Sf To (N) Adu (New 400 Sq Ft. Jadu Total), (N) 270 Sf. Covered Patio. (Four Bedroom With One Recreation Room-Two Bathroom Sfr To Three Bedroom-Two-Bathroom Sfr)
  • 2023
    permit on fileRoom addition: 60 Sf Addition To (E) Detached Garage And Add New 495 Sf. Adu Attached To (E) Detached Garage.
  • 2023
    permit on fileHeating & cooling: Mechanical For Demo 310 Sf (E) Room And 68 Sf (E) Attached Storage. Converting 255 Sf Of Sfr To Junior Adu And Add 145 Sf To (N) Junior Adu (New 400 Sq Ft. Jadu Total), (N) 270 Sf. Covered Patio. (Four Bedroom With One Recreation Room-Two Bathroom Sfr To Three Bedroom-Two-Bathroom Sfr)
  • 2023
    permit on fileWater heater: Plumbing For Demo 310 Sf (E) Room And 68 Sf (E) Attached Storage. Converting 255 Sf Of Sfr To Junior Adu And Add 145 Sf To (N) Junior Adu (New 400 Sq Ft. Jadu Total), (N) 270 Sf. Covered Patio. (Four Bedroom With One Recreation Room-Two Bathroom Sfr To Three Bedroom-Two-Bathroom Sfr) - Gas Tankless
  • 2023
    permit on fileElectrical: Electrical For 60 Sf Addition To (E) Detached Garage And Add New 495 Sf. Adu Attached To (E) Detached Garage - 100A Subpanel On Adu
  • 2023
    permit on fileHeating & cooling: Mechanical For 60 Sf Addition To (E) Detached Garage And Add New 495 Sf. Adu Attached To (E) Detached Garage.
  • 2023
    permit on fileWater heater: Plumbing For 60 Sf Addition To (E) Detached Garage And Add New 495 Sf. Adu Attached To (E) Detached Garage - Gas Tankless Water Heater
  • 2023
    permit on fileElectrical: Electrical For Demo 310 Sf (E) Room And 68 Sf (E) Attached Storage. Converting 255 Sf Of Sfr To Junior Adu And Add 145 Sf To (N) Junior Adu (New 400 Sq Ft. Jadu Total), (N) 270 Sf. Covered Patio. (Four Bedroom With One Recreation Room-Two Bathroom Sfr To Three Bedroom-Two-Bathroom Sfr) - 100A Subpan

Manage this home to schedule a service or to update the timeline.