LAHomework Sign in
Los Angeles, CA 90037 · W 52nd St

342 W 52nd St

Built 1908 · 2,242 sq ft
LOT 6,449 SQ FT · 3 STRUCTURES · APN 5110-028-017Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1908
Living area
2,242 sqft
Lot size
6,449 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
2
Home type
Duplex (2 units)
Parcel (APN)
5110-028-017

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2015
Expected 2035 to 2045From the 2015 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 245 homes on W 52nd St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedKitchen: (1)Kitchen/(2)Bathroom Remodel For Residential Buildings (No Structural Changes). (20) Window Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All Residential Bui
  • 2026
    permit on file, unconfirmedKitchen: (1)Kitchen/(1)Bathroom Remodel For Residential Buildings (No Structural Changes). (5) Window Change-Out (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All Residential Buil
  • 2022
    permit on file, unconfirmedSolar: Installation Of Roof-Mounted Microinverter/Ac Module Solar Pv System, Notexceeding A Total Ac Output Of 10 Kw, In A 1 Or 2 Family Dwelling.
  • 2019
    permit on fileElectrical: Electrical Permit · MAXIMUM VOLTAGE ELECTRICAL SERVICE
  • 2015
    permit on fileRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pound Per Sq. · ARANA ROOFING

Manage this home to schedule a service or to update the timeline.