LAHomework Sign in
Los Angeles, CA 90018 · Obama Blvd

3327 Obama Blvd

Built 1944 · 1,008 sq ft
LOT 6,082 SQ FT · 3 STRUCTURES · APN 5044-001-018Lot Structure
0 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1944
Living area
1,008 sqft
Lot size
6,082 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
1
Home type
Single-family
Parcel (APN)
5044-001-018

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2025
Expected 2045 to 2055From the 2025 permit
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterOn record 2025
Expected 2035 to 2040From the 2025 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 108 homes on Obama Blvd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileRoof: Remodel To Existing Single Family Dwelling To Remove And Replace Roof Framing Over Entire Structure, Remove And Replace All Windows And Doors. All Work Per Engineer Design.
  • 2025
    permit on file, unconfirmedElectrical: (1)-200-Amp Temporary Power Pole, (1)-200-Amp Distribution Panel & (2)-20 Receptacles. Tempoary Power Is Needed For Home Remodel. "Comply With Department Order Effective Date 01/06/2025. Permit Will Expire 30 Days From Issuance Date".
  • 2025
    permit on fileElectrical: Electrical Repairs And Rewiring Of The Entire House Stemming From Major Fire Damage To The Property"Comply With Department Order Effective Date01/06/2025. Permit Will Expire 30 Days From Issuance Date".
  • 2025
    permit on fileHeating & cooling: Hvac/Mechanical Repairs Stemming From Major Fire Damage To The Property To Include Replacing Air Handler And Condensorcomply With Department Order With An Effective Date 1-6-25. Permit To Expire 30 Days From Issue Date.
  • 2025
    permit on fileWater heater: Plumbing Repairs Stemming From Major Fire Damage To The Property That Includes Replacing Fixtures And Installing A New Water Heater"Comply With Department Order Effective Date 01/06/2025. Permit Will Expire 30 Days From Issuance Date".

Manage this home to schedule a service or to update the timeline.