LAHomework Sign in
Los Angeles, CA 90291 · 25th Ave

33 25th Ave

Built 2009 · 3,311 sq ft
LOT 2,628 SQ FT · 1 STRUCTURE · APN 4226-017-015Lot Structure
3 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2009
Living area
3,311 sqft
Lot size
2,628 sqft
Structures on lot
1
Bedrooms
1
Bathrooms
2
Home type
Single-family
Parcel (APN)
4226-017-015

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

3 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofComing up
Expected 2029 to 2039From build year 2009
20262035
HVACWorth a look now
Expected 2024 to 2029From build year 2009
20262035
Water heaterWorth a look now
Usually done by 2024From build year 2009

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 10 homes on 25th Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on file, unconfirmedRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing _15_____Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labe
  • 2023
    permit on fileSolar: Eplan: 4.68 Kw Dc/ 4.2Kw Ac Grid Tied Solar Photovoltaic System With 11 Modules / Microinverter And 1 Load Center.
  • 2022
    permit on fileElectrical: Main Panel Upgrade From To 200 Amps To 400 Amp Surface Mount , Sub Panel Upgrade To 125 Amps And Replacement Of A Back Up Generator .
  • 2021
    permit on fileGeneral remodel: Interior Remodel To The (E) 3-Story Single Family Dwelling & Add (N) Elevator. All Work Per Engineering.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2024
  • Now
    HVAC replacementExpected 2024 to 2029
  • 2029
    Roof replacementExpected 2029 to 2039