LAHomework Sign in
Glendale, CA 91205 · Fischer St

325 Fischer St

Built 1923 · 2,687 sq ft
LOT 7,466 SQ FT · 2 STRUCTURES · APN 5680-013-019Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1923
Living area
2,687 sqft
Lot size
7,466 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
7
Bathrooms
4
Home type
Fourplex (4 units)
Parcel (APN)
5680-013-019

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2018
Expected 2038 to 2048From the 2018 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2008
Usually done by 2023From the 2008 permit

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 55 homes on Fischer St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2018
    permit on fileRoof: Roof
  • 2008
    permit on fileWater heater: Back Duplex - - 1 Tankless Water Heater And 1 Clothes Washer
  • 2008
    permit on fileElectrical: For Addresses 325 Fischer St (A,B,C, House) - - 1 200 Amp Service, 4 Distribution Panels ( 8 Spaces) Each And 1 Switchboard
  • 2004
    permit on fileRoof: Material: Comp Shingle Class A (Guest House) - No. Of Squares: 11 - Tear Off Existing (Y/N): Y - Existing No. Of Layers: 2 - New Sheathing (Y/N): N - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing
  • 2004
    permit on fileRoof: Material: Comp Shingle Class A - No. Of Squares: 13 - Tear Off Existing (Y/N): Y - Existing No. Of Layers: 2 - New Sheathing (Y/N): N - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheath

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2023