LAHomework Sign in
Castaic, CA 91384 · The Old Rd

32486 The Old Rd

Built 1998 · 3,776 sq ft
LOT 10,382 SQ FT · 1 STRUCTURE · APN 2865-090-026Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1998
Living area
3,776 sqft
Lot size
10,382 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
4
Home type
Single-family
Parcel (APN)
2865-090-026

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2018 to 2028From build year 1998
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 174 homes on The Old Rd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on file, unconfirmedSolar: Roof Mounted Residential Solar Pv 11.8Kwdc 10.7Kwac 29 Modules 29 Micro-Inverters, 1 125A Solar Load Center, 1 Combiner Box, 3 5.0Kwh Ess, 1 System Controller, 1 200A Backup Panel.
  • 2024
    permit on file, unconfirmedSolar: Add Solar To Existing Pv System 11.89 Kw, 29 Panels, 612 Sq Ft Array.
  • 2024
    permit on file, unconfirmedElectrical: Install (3) Battery, (1) 200 Amp Sub Panel.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2018 to 2028