LAHomework Sign in
Glendale, CA 91206 · N Jackson St

323 N Jackson St Unit 101

Built 1977 · 1,295 sq ft
SHARED CONDO LOT · APN 5643-017-060Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1977
Living area
1,295 sqft
Lot
Shared (condo complex)
Bedrooms
2
Bathrooms
2
Home type
Condo / townhome
Parcel (APN)
5643-017-060

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2010
Expected 2030 to 2040From the 2010 permit
20262035
HVACOn record 2005
Usually done by 2025From the 2005 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 378 homes on N Jackson St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2010
    permit on fileRoof: Residential Reroof As Follows:- - - Estimated Cost Of Re-Roof:29000.00 - This Is A Change Of Roofing Material (Y/N):N - Proposed Roofing Material:Class A, Single Ply Tpo Cool Roof Provided - Squares (100 Sf) Being Installed:70 Sqs Partial Roofing - Tear Off Existing (Y/N):Y - Existing Layers Of Roof
  • 2005
    permit on fileRoof: Residential Reroof As Follows:- - - This Is A Change Of Roofing Material (Y/N): No - Proposed Roofing Material: Built Up Class A - Squares (100 Sf) Being Installed: 78 Sqs - Tear Off Existing (Y/N): Yes - Existing Layers Of Roofing: One - New Sheathing Being Installed (Y/N): No - High Fire Hazard Zo
  • 2005
    permit on fileHeating & cooling: 1 A/C Altered, Repaired, Or Added
  • 2005
    permit on fileHeating & cooling: 1 A/C Altered, Repaired, Or Added
  • 2005
    permit on fileHeating & cooling: 1 A/C Altered, Repaired, Or Added
  • 2005
    permit on fileHeating & cooling: 1 A/C Altered, Repaired, Or Added
  • 2005
    permit on fileHeating & cooling: 1 A/C Altered, Repaired, Or Added
  • 2005
    permit on fileHeating & cooling: 1 A/C Altered, Repaired, Or Added
  • 2005
    permit on fileHeating & cooling: 1 A/C Altered, Repaired, Or Added
  • 2005
    permit on fileHeating & cooling: 1 A/C Altered, Repaired, Or Added
  • 2005
    permit on fileHeating & cooling: 1 A/C Altered, Repaired, Or Added
  • 2005
    permit on fileHeating & cooling: 1 A/C Altered, Repaired, Or Added
  • 2005
    permit on fileHeating & cooling: 1 A/C Altered, Repaired, Or Added
  • 2005
    permit on fileHeating & cooling: 1 A/C Altered, Repaired, Or Added
  • 2005
    permit on fileHeating & cooling: 1 A/C Altered, Repaired, Or Added
  • 2005
    permit on fileHeating & cooling: 1 Heating Appliance 60000 B.T.U., 1 Compressor 3 Ton And 1 Connection To A Gas System
  • 2005
    permit on fileHeating & cooling: 1 Heating Appliance 60000 B.T.U., 1 Compressor 3 Ton And 1 Connection To A Gas System
  • 2005
    permit on fileHeating & cooling: 1 Heating Appliance 60000 B.T.U., 1 Compressor 31/5 Ton And 1 Connection To A Gas System
  • 2005
    permit on fileHeating & cooling: 1 Heating Appliance 60000 B.T.U., 1 Compressor 3 Ton And 1 Connection To A Gas System
  • 2005
    permit on fileHeating & cooling: 1 Heating Appliance 60000 B.T.U., 1 Compressor 3 Ton And 1 Connection To A Gas System
  • 2005
    permit on fileHeating & cooling: 1 Heating Appliance 60000 B.T.U., 1 Compressor 31/5 Ton And 1 Connection To A Gas System
  • 2005
    permit on fileHeating & cooling: 1 Heating Appliance 60000 B.T.U., 1 Compressor 3 Ton And 1 Connection To A Gas System
  • 2005
    permit on fileHeating & cooling: 1 Heating Appliance 60000 B.T.U., 1 Compressor 31/5 Ton And 1 Connection To A Gas System
  • 2005
    permit on fileHeating & cooling: 1 Heating Appliance 60000 B.T.U., 1 Compressor 31/5 Ton And 1 Connection To A Gas System
  • 2005
    permit on fileHeating & cooling: 1 Heating Appliance 60000 B.T.U., 1 Compressor 31/5 Ton And 1 Connection To A Gas System
  • 2005
    permit on fileHeating & cooling: 1 Heating Appliance 60000 B.T.U., 1 Compressor 31/5 Ton And 1 Connection To A Gas System
  • 2005
    permit on fileHeating & cooling: 1 Heating Appliance 60000 B.T.U., 1 Compressor 3 Ton And 1 Connection To A Gas System
  • 2005
    permit on fileHeating & cooling: 1 Heating Appliance 60000 B.T.U., 1 Compressor 31/5 Ton And 1 Connection To A Gas System
  • 2005
    permit on fileHeating & cooling: 1 Heating Appliance 60000 B.T.U., 1 Compressor 3 Ton And 1 Connection To A Gas System
  • 2005
    permit on fileHeating & cooling: 1 Heating Appliance 60000 B.T.U., 1 Compressor 3 Ton And 1 Connection To A Gas System
  • 2005
    permit on fileHeating & cooling: 1 Heating Appliance 60000 B.T.U., 1 Compressor 31/5 Ton And 1 Connection To A Gas System
  • 2005
    permit on fileHeating & cooling: Installing A New A/C And Htng System.
  • 2004
    permit on fileHeating & cooling: 1 Fau To 100, 000 Btu, (1) Up To 3 Hp Motor, 1 Electric A/C & Compressor
  • 2003
    permit on filePlumbing: 2 Miscellaneous, (Pool Skimmer & Return
  • 2003
    permit on fileHeating & cooling: 1 Heating And 1 Air Conditioning System
  • 2003
    permit on fileElectrical: 1 Branch Circuit

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2025
  • 2030
    Roof replacementExpected 2030 to 2040