LAHomework Sign in
Acton, CA 93510 · Joaquin Dr

32201 Joaquin Dr

Built 1991 · 3,378 sq ft
LOT 43,533 SQ FT · 1 STRUCTURE · APN 3056-032-047Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1991
Living area
3,378 sqft
Lot size
43,533 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
5
Home type
Single-family
Parcel (APN)
3056-032-047

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Usually done by 2021From build year 1991
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2019
Expected 2029 to 2034From the 2019 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 7 homes on Joaquin Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedHeating & cooling: Install 3.5 Ton Split System In Attic. Install Mini Split In Studio.
  • 2019
    permit on fileWater heater: Water Heater Change Out
  • 2019
    permit on fileElectrical: Install New 22 Kw Generator With Transfer Switch
  • 2019
    permit on filePlumbing: Low Pressure Gas Line For New Generator See Unc-Elec191122006510

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementUsually done by 2021
  • 2029
    Water heater replacementExpected 2029 to 2034