LAHomework Sign in
Alhambra, CA 91803 · Poplar Blvd

3213 Poplar Blvd

Built 1929 · 1,938 sq ft
LOT 7,466 SQ FT · 2 STRUCTURES · APN 5292-023-033Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1929
Living area
1,938 sqft
Lot size
7,466 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
2
Home type
Duplex (2 units)
Parcel (APN)
5292-023-033

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 57 homes on Poplar Blvd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedElectrical: Mep For Interior Remodel
  • 2026
    permit on file, unconfirmedRoom addition: Interior Remodel For The Existing Unit B. Relocating Kitchen And Bedroom #1
  • 2026
    permit on fileElectrical: Mep Permit For New Adu Permit Badu25-0077
  • 2026
    permit on fileRoom addition: 1. Demolition Existing Detached Garage: 324 Sf. 2. Proposed 2-Stories Adu, Unit 1 Adu (520 Sf) Of 1St Flr. Unit 2 Adu (520 Sf) Of 2Nd Flr. 3. Proposed Outside Stair (64 Sf.) Attached New Adu.
  • 2026
    permit on fileSolar: Rooftop Mounted Solar Energy System Pv 8 Q.Tron Blk M-G2.C1+ /Ac 430 Solar Modules 8 Q.Mi.349B-G1 {240V} Microinverters New Busbar Count - 1 System Size: 3.44 Kw Dc (2.79 Kw Ac)

Manage this home to schedule a service or to update the timeline.