LAHomework Sign in
Pasadena, CA 91101 · S Madison Ave

320 S Madison Ave

Built 1896 · 4,198 sq ft
LOT 8,658 SQ FT · 3 STRUCTURES · APN 5734-016-009Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1896
Living area
4,198 sqft
Lot size
8,658 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
1
Bathrooms
2
Home type
Triplex (3 units)
Parcel (APN)
5734-016-009

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2022
Expected 2042 to 2052From the 2022 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2013
Expected 2023 to 2028From the 2013 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 294 homes on S Madison Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on file, unconfirmedRoof: Remove And Replace (11) Windows. Material Change From Wood To Fiberx. No Structural Changes.
  • 2024
    permit on file, unconfirmedRoof: Remove And Replace (3) Windows. Like For Like. No Structural Changes.
  • 2024
    permit on file, unconfirmedRoof: Remove And Replace 1 Window And 1 Patio Door. Unit 201 Is Being Cut Down 20 Inches And Changed From A Window To A Door, This Will Be The Only Modification. The Rest Of The Units Are Being Replaces Like For Like. All Window And Doors Will Have High Low E4 Smart Glass, Be Egress And Title 24 Compliant
  • 2022
    permit on fileRoof: Replace (14 Windows), Same Size And Location
  • 2020
    permit on fileRoof: Tear Off And Re-Roof Existing Roof With New New Synthetic Underlayment And Install 2 Layers Of Gaf Birchwood Colored Shingles
  • 2013
    permit on fileWater heater: Legalize Water Heater Change Out
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 1991
    permit on fileElectrical: El - Underground Utility Conversion

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementExpected 2023 to 2028