LAHomework Sign in
Glendale, CA 91205 · E Maple St

319 E Maple St

Built 1907 · 2,507 sq ft
LOT 8,640 SQ FT · 3 STRUCTURES · APN 5641-010-017Lot Structure
3 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1907
Living area
2,507 sqft
Lot size
8,640 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
4
Home type
Fourplex (4 units)
Parcel (APN)
5641-010-017

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

3 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2005
Expected 2025 to 2035From the 2005 permit
20262035
HVACOn record 2010
Expected 2025 to 2030From the 2010 permit
20262035
Water heaterOn record 2019
Expected 2029 to 2034From the 2019 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 217 homes on E Maple St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileElectrical: Electrical Service Spot
  • 2025
    permit on file, unconfirmedRoom addition: (N) 510 Sq. Ft. Adu 1 Bedroom & 1 Bathroom & 47.25 Sq Ft Front Porch. Future Adu Address To Be 319 E Maple Street Unit A.
  • 2020
    permit on filePlumbing: Relocate 1 Gas Meter.
  • 2019
    permit on fileElectrical: 1 200Amp Service Meter Replacing Services At 319 And 319 1/2 East Maple St
  • 2019
    permit on fileElectrical: 14 Outlets, 6 Branch Circuits, 1 Motor Over 1 Not Over 5Hp. 9/25/19 Revised Address S/B 319 1/2 E Maple And Not 319 E. Maple 10-14-19 Additional Scope: 2 Branch Circuits, 20 Spaces In Dist. Panels
  • 2019
    permit on fileWater heater: Install Laundry Drain And Change Water Heater One Shower, One Clothes Washer One Water Heater Revised 9/9/19 Instead Of Dishwasher S/B Clothes Washer
  • 2019
    permit on fileBathrooms: 1-Bathroom Remodel. Drywall And Inusllation Living Room And Bedroom. No Movement Of Walls. No Structure Changes. No Exterior Changes. Trades Separate Permit
  • 2015
    permit on fileWater heater: 1 Water Heater Re-Pipe 2Bathroom Or Less Or Kitchen (Per Dwelling Unit)
  • 2015
    permit on fileWater heater: 1 Toilet, 1 Sink, 1 Bathtub, 2 Water Heater, Repipe 2 Bathroom Or Less Or Kitchen (Per Dwelling Unit)
  • 2015
    permit on filePlumbing: 1 Exterior Water Service
  • 2010
    permit on fileHeating & cooling: 1 Suspended Wall Or Floor Mounted Ceiling
  • 2008
    permit on fileHeating & cooling: 1 Wall Heater
  • 2005
    permit on fileRoof: Residential Reroof As Follows:- - - This Is A Change Of Roofing Material (Y/N): N - Proposed Roofing Material: Comp Shingle, Class A - Squares (100 Sf) Being Installed: 13 - Tear Off Existing (Y/N): Y - Existing Layers Of Roofing: 5 - New Sheathing Being Installed (Y/N): Y - High Fire Hazard Zone (Y
  • 2004
    permit on fileHeating & cooling: (1) Floor Furnace Including Vent

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2025 to 2035
  • Now
    HVAC replacementExpected 2025 to 2030
  • 2029
    Water heater replacementExpected 2029 to 2034