LAHomework Sign in
El Monte, CA 91731 · Lexington Ave

3169 Lexington Ave

Built 1948 · 2,312 sq ft
LOT 9,918 SQ FT · 3 STRUCTURES · APN 8580-023-013Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1948
Living area
2,312 sqft
Lot size
9,918 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
6
Bathrooms
2
Home type
Single-family
Parcel (APN)
8580-023-013

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2011
Expected 2031 to 2041From the 2011 permit
20262035
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterOn record 2024
Expected 2034 to 2039From the 2024 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 90 homes on Lexington Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileHeating & cooling: Installation Of New Heat Pump Air Handler, Condenser And Ducting
  • 2024
    permit on fileBathrooms: Remodel Of (E) Bathroom. Work To Include: Replacement Of Vanity, Bathtub, Shower & Toilet. All Plumbing Fixtures To Remain At Same Location.
  • 2024
    permit on fileKitchen: Remodel Kitchen (No Structural Changes) Like For Like.
  • 2024
    permit on fileHeating & cooling: Re: Removing Unpermitted Through -Wall Ac Unit (1) In Family Room And (1) In Bedroom 1. ( Field To Verify Framing).
  • 2024
    permit on fileGeneral remodel: Re: Remove All Unpermitted Plumbing, Electrical & Mechanical, All Unpermitted Drywall In Garage And Restore Back To Its Original Use.
  • 2024
    permit on fileWater heater: Changeout To New 40 Gal Water Heater Inside Residence.
  • 2024
    permit on fileElectrical: Main Electrical Panel Upgrade To 200 Amps. Same Location.*** 6/25/24 Revised Added To Legalize 60 Amp Sub Panel Located Inside Residence. ***09/10/2024 Revisions To Issued Permit, Changeout Of Electrical Receptacles And Switches Throughout (56 Total).
  • 2019
    permit on fileRoom addition: Changeout (1) Retrofit Window ( Bedroom Windows Must Meet Egress Crc R310)
  • 2011
    permit on fileRoof: Tear Off, Install 40 Year Class A Compostion Shingles, House & Garage (29 Sqs)

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2031
    Roof replacementExpected 2031 to 2041