LAHomework Sign in
Arcadia, CA 91006 · Hempstead Ave

3144 Hempstead Ave

Built 1949 · 1,337 sq ft
LOT 8,266 SQ FT · 2 STRUCTURES · APN 8572-010-020Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1949
Living area
1,337 sqft
Lot size
8,266 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
8572-010-020

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 56 homes on Hempstead Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileHeating & cooling: Install New Condenser In Back Yard.
  • 2024
    permit on filePlumbing: Plumbing For New Detached 787 Sf Manufactured Home/Adu (2 Bed, 2 Bath) Connect Existing House Water To Approved Adu
  • 2024
    permit on filePlumbing: Sewer For New Detached 787 Sf Manufactured Home/Adu (2 Bed, 2 Bath) Connect Sewer Of Adu To Main House Sewer Lateral
  • 2024
    permit on fileElectrical: Electrical For New Detached 787 Sf Manufactured Home/Adu (2 Bed, 2 Bath) - Connect Adu To Existing Homes Panel
  • 2024
    permit on fileElectrical: 200A Mpu.
  • 2024
    permit on fileElectrical: Elec New 100A Panel For New Detached 787 Sf Manufactured Home/Adu (2 Bed, 2 Bath)
  • 2023
    permit on fileGeneral remodel: Voluntary Seismic Retrofit Per La City Standards, Detail #7

Manage this home to schedule a service or to update the timeline.