LAHomework Sign in
Santa Monica, CA 90405 · Frederick St

3111 Frederick St

Built 1956 · 1,817 sq ft
LOT 5,798 SQ FT · 1 STRUCTURE · APN 4285-034-003Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1956
Living area
1,817 sqft
Lot size
5,798 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
2
Home type
Single-family
Parcel (APN)
4285-034-003

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 6 homes on Frederick St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on file, unconfirmedElectrical: Add 40 Amp Circuit For Oven
  • 2023
    permit on fileRoof: Re-Roof Single Family Residence, Installation Of Architectural Title 24 Compliant Shingles On Main House And Garage. Remove Two Layers Down To Decking. 2456 Sq. Ft.
  • 2023
    permit on fileSolar: Installation Of A 6.4 Kw, 7.6 Kw Ac, 6.4 Kw Dc Photovoltaic System Mounted On Roof And Consisting Of 16 Panels, 400W Modules, One (1) New Subpanel And One (1) Tesla Powerwall Energy Storage System. Revision 23Bld-2863: Revised Gateway Location.
  • 2019
    permit on fileElectrical: C.L.A. Electric Will Install Conduit And Wire From Main Panel In The Backyard That Will Connect To A New Nema 14-50 Outlet Inside The Garage. - A New 50 Amps 240V Breaker Will Be Installed In The 200 Amps Main Panel Located In The Back Yard. - A 240V Line Will Run Under The House (Approx. 70 Ft.) An

Manage this home to schedule a service or to update the timeline.