LAHomework Sign in
Castaic, CA 91384 · Sequoia Ct

30426 Sequoia Ct

Built 1994 · 2,046 sq ft
LOT 7,100 SQ FT · 1 STRUCTURE · APN 2865-062-009Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1994
Living area
2,046 sqft
Lot size
7,100 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
3
Home type
Single-family
Parcel (APN)
2865-062-009

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Usually done by 2024From build year 1994
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2018
Expected 2028 to 2033From the 2018 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 11 homes on Sequoia Ct →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2018
    permit on filePool: (N) Enclosed Spa 51 Sq Ft W/ (E) Pool. Standard Plan #26077-17.
  • 2018
    permit on fileElectrical: Electrical For (N) Enclosed Spa 51 Sq Ft W/ (E) Pool.
  • 2018
    permit on filePlumbing: Gas Line For Bbq.
  • 2018
    permit on fileKitchen: Remove (E) Doorin Kitchen And Replace W/ (N) Shear Wall. Replace (E) Wndow W/(N) Sliding Door. 72"X80"
  • 2018
    permit on fileWater heater: Replace Tankless Water Heater In Backyard. Like For Like.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementUsually done by 2024
  • 2028
    Water heater replacementExpected 2028 to 2033