LAHomework Sign in
Glendale, CA 91205 · E Elk Ave

303 E Elk Ave

Built 1958 · 4,502 sq ft
LOT 11,453 SQ FT · 3 STRUCTURES · APN 5641-004-013Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1958
Living area
4,502 sqft
Lot size
11,453 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Home type
Fourplex (4 units)
Parcel (APN)
5641-004-013

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2009
Expected 2029 to 2039From the 2009 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 80 homes on E Elk Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: (N) 225A/200A Main Panel
  • 2025
    permit on fileSolar: Installation Of A 18 Module Solar Pv System With 18 Microinverter. System Size Is 7.380 Kwp + (N) 225A/200A Main Panel + (N) Visible/Lockable Labeled Ac Disconnect + (N) 125A Enphase Iq Combiner 5C
  • 2009
    permit on fileRoof: Residential Reroof As Follows: - - Estimated Cost Of Re-Roof:12000 - This Is A Change Of Roofing Material (Y/N):No - Proposed Roofing Material:Comp Shingles - Squares (100 Sf) Being Installed:30 - Tear Off Existing (Y/N):Yes - Existing Layers Of Roofing:2 - New Sheathing Being Installed (Y/N):Yes -
  • 2006
    permit on filePlumbing: Re-Pipe (4 Bathrooms)
  • 2003
    permit on fileRoof: Material: Duro-Last Class A - No. Of Squares: 60 Sqs. - Tear Of Existing (Y/N): Yes - Existing No. Of Layers: 3-Rock - New Sheathing (Y/N): No - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spac

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2029
    Roof replacementExpected 2029 to 2039