LAHomework Sign in
Huntington Park, CA 90255 · Flower St

3022 Flower St

Built 1925 · 1,162 sq ft
LOT 5,956 SQ FT · 2 STRUCTURES · APN 6212-010-018Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1925
Living area
1,162 sqft
Lot size
5,956 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
1
Home type
Single-family
Parcel (APN)
6212-010-018

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 308 homes on Flower St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileRoom addition: 965 Sf [E] Garage Conversion And Addition To [N] Accessory Dwelling Unit (Adu). Demo [E] Attatched & Rear Porch, New Adu To Include Two Bedrooms And Two Bathrooms.
  • 2024
    permit on fileElectrical: 965 Sf [E] Garage Conversion And Addition To [N] Accessory Dwelling Unit (Adu). Demo [E] Attatched & Rear Porch, New Adu To Include Two Bedrooms And Two Bathrooms.
  • 2024
    permit on fileHeating & cooling: 965 Sf [E] Garage Conversion And Addition To [N] Accessory Dwelling Unit (Adu). Demo [E] Attatched & Rear Porch, New Adu To Include Two Bedrooms And Two Bathrooms.
  • 2024
    permit on filePlumbing: 965 Sf [E] Garage Conversion And Addition To [N] Accessory Dwelling Unit (Adu). Demo [E] Attatched & Rear Porch, New Adu To Include Two Bedrooms And Two Bathrooms.
  • 2024
    permit on filePlumbing: 965 Sf [E] Garage Conversion And Addition To [N] Accessory Dwelling Unit (Adu). Demo [E] Attatched & Rear Porch, New Adu To Include Two Bedrooms And Two Bathrooms.
  • 2023
    permit on fileRoof: Tear Off And Re-Roof Sfd, With Gaf Everguard White Crrc 0676-0027, Aprox 12 Sqs
  • 2022
    permit on fileHeating & cooling: Install New 60K Btu Roof Top Package Unit With 9 Duct Runs.
  • 2022
    permit on fileElectrical: Install 1 New Disconnect At Package Unit

Manage this home to schedule a service or to update the timeline.