LAHomework Sign in
Glendale, CA 91202 · Parkwood Dr

300 Parkwood Dr

Built 1959 · 1,727 sq ft
LOT 8,783 SQ FT · 1 STRUCTURE · APN 5633-006-008Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1959
Living area
1,727 sqft
Lot size
8,783 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
2
Home type
Single-family
Parcel (APN)
5633-006-008

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2004
Expected 2024 to 2034From the 2004 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 20 homes on Parkwood Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on filePool: Resurfacing New Plaster New Coping Tiles And Pavers
  • 2016
    permit on fileElectrical: One 101-200 Amp Service
  • 2016
    permit on fileKitchen: Kitchen Remodel. Replace Fixtures In Samae Location. No Exterior Changes. No Structural Changes. No Movement Of Walls. Drywall Kitchen Only Due To Water Damage. Low Flow Plumbing. Includes Trades
  • 2004
    permit on fileRoof: Material: Comp Shingle House And Attached Garage Class A - No. Of Squares: 38 - Tear Off Existing (Y/N): Y - Existing No. Of Layers: 1 - New Sheathing (Y/N): N (Existing) - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2024 to 2034