LAHomework Sign in
Altadena, CA 91001 · Casitas Ave

2967 Casitas Ave

Built 1926 · 1,288 sq ft
LOT 10,178 SQ FT · 1 STRUCTURE · APN 5829-029-041Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1926
Living area
1,288 sqft
Lot size
10,178 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
5829-029-041

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 117 homes on Casitas Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileHeating & cooling: Mechanical For House Cosmetic Remodel Including Kitchen And Bathroom Remodels, Complete Rewire And Repiping, Replacement Of Electrical Fixtures, Installation Of New Roof, And Upgrade Of Electrical Service Panel To 200 Amps. Additional Work Added 11/25/2025: Replace Fau/Condensing Unit & New Ductwork
  • 2025
    permit on fileElectrical: Electrical For House Cosmetic Remodel Including Kitchen And Bathroom Remodels, Complete Rewire And Repiping, Replacement Of Electrical Fixtures, Installation Of New Roof, And Upgrade Of Electrical Service Panel To 200 Amps. Additional Work Added 11/25/2025: 100 Amp Subpanel & Fau/Condensing Unit
  • 2025
    permit on filePlumbing: Plumbing For House Cosmetic Remodel Including Kitchen And Bathroom Remodels, Complete Rewire And Repiping, Replacement Of Electrical Fixtures, Installation Of New Roof, And Upgrade Of Electrical Service Panel To 200 Amps.
  • 2025
    permit on fileBathrooms: House Remodel: Including Converting Existing Family To A New Bedroom, Adding A New Bathroom, Eleven New Windows, Infilling Five Windows And Replacing One Door. No Structural Changes, No Additional Square Footage, And No New Openings.
  • 2025
    permit on fileElectrical: Elec For House Remodel: Including Converting Existing Family To A New Bedroom, Adding A New Bathroom, Eleven New Windows, Infilling Five Windows And Replacing One Door. No Structural Changes, No Additional Square Footage, And No New Openings.
  • 2025
    permit on fileHeating & cooling: Mech For House Remodel: Including Converting Existing Family To A New Bedroom, Adding A New Bathroom, Eleven New Windows, Infilling Five Windows And Replacing One Door. No Structural Changes, No Additional Square Footage, And No New Openings.

Manage this home to schedule a service or to update the timeline.