LAHomework Sign in
Glendale, CA 91214 · Hermosa Ave

2948 Hermosa Ave

Built 1950 · 1,754 sq ft
LOT 6,180 SQ FT · 3 STRUCTURES · APN 5610-015-034Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1950
Living area
1,754 sqft
Lot size
6,180 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
5610-015-034

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2010
Expected 2025 to 2030From the 2010 permit
20262035
Water heaterOn record 2010
Usually done by 2025From the 2010 permit

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 98 homes on Hermosa Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileElectrical: 200 Amp Upgrade 2948 Hermosa Ave Unit A Glendale Ca 91214
  • 2019
    permit on filePlumbing: 1 Sump Pump / Sewer Ejector
  • 2018
    permit on fileRoom addition: 214 S.F. Addition To The Existing 385 S.F. Garage & Converting Of The Garage To An Adu (599 S.F. Total) Includes Trades
  • 2010
    permit on fileBathrooms: Converting Closet To 1/2 Bath (No Movement Of Wall Or Exterior Work) Includes Trades New Or Relocated Hvac Or Electrical Service Requires Separate Permits.
  • 2010
    permit on fileElectrical: One 200 Amp Service And 15 Branch Circuits
  • 2010
    permit on fileHeating & cooling: 1 Heating Appliance, 1 A/C Backyard, 1 Electrical For A/C, 1 Connetion To Gas
  • 2010
    permit on fileGeneral remodel: Replacing Windows (9) And Closing 1
  • 2010
    permit on fileWater heater: 1 Water Heater Tankless, 1 Repipe

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2025
  • Now
    HVAC replacementExpected 2025 to 2030