LAHomework Sign in
Agoura Hills, CA 91301 · Malibu View Ct

29462 Malibu View Ct

Built 2004 · 7,768 sq ft
LOT 47,295 SQ FT · 3 STRUCTURES · APN 2063-047-007Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2004
Living area
7,768 sqft
Lot size
1.09 acres
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
6
Home type
Single-family
Parcel (APN)
2063-047-007

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2024 to 2034From build year 2004
20262035
HVACOn record 2021
Expected 2036 to 2041From the 2021 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 13 homes on Malibu View Ct →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on file, unconfirmedGeneral remodel: Remove And Replace 10 Patio Doors And 1 Entry Door, Like Sizes. No Structural Work
  • 2023
    permit on file, unconfirmedSolar: Roof Mounted Pv Solar + Energy Storage Systems 30 Panels X 12 Kw Pv Array 4 X13.5 Kwh Ess= 54 Kwh Ess 200A Internal Load Center 225A Distribution Panel 400A Main Service Panel 200/2P Main Circuit Breaker
  • 2023
    permit on file, unconfirmedElectrical: 2X Powerwall+, 2X Powerwall, 200A Subpanel, 200A Single Breaker Box, 400A Main Panel. Related To Unc-Solr221228007382.
  • 2023
    permit on file, unconfirmedElectrical: 400A Main Panel Upgrade And 200A Sub Panel Installation
  • 2022
    permit on filePlumbing: Repair Using Abs Pipe And Fittings Aprox. 5Ft. On Property Side, Spot Repair.
  • 2021
    permit on fileKitchen: Remodel 6 Existing Like To Like Bathrooms. No Structural Changes. Replacing Kitchen Cabinets And Counter Tops.
  • 2021
    permit on filePlumbing: Plumbing For Remodel
  • 2021
    permit on fileElectrical: Electrical For Remodel
  • 2021
    permit on fileHeating & cooling: Mechanical For Remodel

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2024 to 2034