LAHomework Sign in
South Gate, CA 90280 · Missouri Ave

2946 Missouri Ave

Built 1929 · 1,153 sq ft
LOT 5,382 SQ FT · 2 STRUCTURES · APN 6206-007-013Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1929
Living area
1,153 sqft
Lot size
5,382 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
6206-007-013

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2018
Expected 2038 to 2048From the 2018 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2025
Expected 2035 to 2040From the 2025 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 204 homes on Missouri Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileGeneral remodel: Inspection Only For New Presale With Ps#25-010281 Inspection Date: Thursday, June 05, 2025 Inspection Hours Are Between 9-5 Pm - Call Inspector David Berrios Between 8-9 Am For A Morning Or Afternoon Confirmation At (323)563-9547 Or (323)563-9549. Please Be Aware That, Although The Inspection Is Ext
  • 2025
    permit on fileWater heater: Correct Plumbing Per Ps#2025-10281, -Front And Rear Yard Sprinkler Systems -Relocated Water Heater From Basement To Exterior Of Dwelling (1) Install Up To Code And Call For Required Inspection.
  • 2025
    permit on filePlumbing: Main Sewer Line Replacement (Within Private Property Only. If Encroaching Into The Public Right Of Way, You Must Obtain A Permit From Public Works)
  • 2025
    permit on fileElectrical: Electrical Panel Upgrade 200 Amps(Requires Edison Meter Spot Approval)
  • 2018
    permit on fileRoof: Home Improvement Permits- For Record Purposes Only Per Home Improvement Program 06/02/1997 Tear Off And Re Roof Built Up Roof To Sheathing - Install New Clay Tile Sandblast And Re Stucco Pour Proper Size Concrete Footing Aroung The Base Of Garage Walls Replacement Of Vehicle Door And Entry Door- Upg
  • 2017
    permit on fileGeneral remodel: Inspection Only For New Ps#2017-8436 Scheduled For Tuesday, 12/19/2017. Inspection Hours Are Between 9-5 Pm - Call Inspector Between 8-9 Am For A Morning Or Afternoon Confirmation At (323)563-9549, Garages Must Be Open For Inspection, Dogs Must Be Tied Please Be Aware That, Although The Inspection I
  • 2011
    permit on fileRoof: Tear Off And Existing-11 Sq'S Ft Dwg-

Manage this home to schedule a service or to update the timeline.