LAHomework Sign in
Los Angeles, CA 90077 · Nicada Dr

2885 Nicada Dr

Built 1975 · 3,525 sq ft
LOT 12,332 SQ FT · 1 STRUCTURE · APN 4379-038-021Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1975
Living area
3,525 sqft
Lot size
12,332 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
4379-038-021

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 42 homes on Nicada Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on fileSolar: Installation Of Roof-Mounted Microinverter/Ac Module Solar Pv System, Notexceeding A Total Ac Output Of 10 Kw, In A 1 Or 2 Family Dwelling.
  • 2022
    permit on file, unconfirmedElectrical: Upgrade Main Electrical Panel To 200 Amps. Install 2 Ev Chargers In Garage
  • 2022
    permit on file, unconfirmedElectrical: Install 40Amp Exterior Sub Panel
  • 2022
    permit on fileElectrical: Upgrade Main Electrical Paneltwo Existing Sub Panels, Two Existing 240 Volt Outlets In Garage For Ev Chargersolar Panels Is Installed
  • 2021
    permit on file, unconfirmedGeneral remodel: Alteration Of Existing Single Garage Door To Double Garage Door
  • 2021
    permit on file, unconfirmedElectrical: Electrical Upgrade At Garage To 200 Volt.

Manage this home to schedule a service or to update the timeline.