LAHomework Sign in
Los Angeles, CA 90046 · Westbrook Ave

2821 Westbrook Ave

Built 1958 · 2,138 sq ft
LOT 7,916 SQ FT · 1 STRUCTURE · APN 5570-031-005Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1958
Living area
2,138 sqft
Lot size
7,916 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5570-031-005

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2024
Expected 2044 to 2054From the 2024 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 27 homes on Westbrook Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over New Solid Sheathing 33 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product
  • 2024
    permit on fileSolar: [Eplan] Pv1 New Rooftop Mounted System, System Size Is 6Kwac, System Inckudes 23 Modules With Optimzers And A Central Inverter And A New Ess And A New 225A Panel, System Is Interconnected To An Existing 200A Msp Via An Mid
  • 2024
    permit on file, unconfirmedElectrical: New 225 Amp Mpu
  • 2024
    permit on fileElectrical: 200 Amp Panel Upgrade
  • 2021
    permit on filePlumbing: Earthquake Valve

Manage this home to schedule a service or to update the timeline.