LAHomework Sign in
Los Angeles, CA 90026 · W Temple St

2812 W Temple St

Built 2022 · 33,710 sq ft
LOT 11,150 SQ FT · 2 STRUCTURES · APN 5156-016-028Lot Structure
0 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2022
Living area
33,710 sqft
Lot size
11,150 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
36
Bathrooms
42
Home type
Fourplex (4 units)
Parcel (APN)
5156-016-028

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
See 2 more systems expected later
RoofLater
Expected 2042 to 2052Original, built 2022
Water heaterLater
Expected 2032 to 2037Original, built 2022
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 23 homes on W Temple St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: Install 1 Electrical Device To Existing Electrical Circuit
  • 2024
    permit on fileGeneral remodel: Project Homekey: Multifamily Housing Program Per Gcs 50675.1.3.Alterations To (E) Mixed-Use Apartment (18010-20000-05663). Alterations Include Accessibility Upgrades.11% Of Total Units For Mobility Units And 4% Of Total Units For Hearing Or Vision Impaired Units.
  • 2024
    permit on fileElectrical: Add Doorbell Chimes For All Dwelling Units.Adjust Kitchen Over The Counter Receptacles, Low Voltage Devices, General Outlets, And Add Hood Fan Control To The Face Of Kitchen Cabinets To Meet Ada Requirements In Dwelling Units.Adjust Switches And Receptacles, Low Voltage In Common Areas, New Laundry
  • 2024
    permit on fileElectrical: Inspect New Installed Light Fixture At (1) Unoccupied Unit
  • 2024
    permit on fileElectrical: Tenant Improvement Build-Out (5) Circuits, (15) Lighting Fixture Outlets And Fixture Installation , (20) New Outlets And Receptacle Installation, And (5) Tv/Tele/Data Locations.
  • 2024
    permit on filePlumbing: Remove And Replace Fixtures, 5 Bathtubs, 4 Clothes Washers, 5 Garbage Disposals, 6 Kitchen Sinks, 5 Other Sinks, 5 Toilets And 4 Gas Outlets For Units 201, 209, 301, 401 And 601.
  • 2024
    permit on filePlumbing: Replace (1) Existing Toilet, (1) Existing Vanity Sink, Install (1) New Kitchen Sink W/Garbage Disposal In A New Office Space
  • 2024
    permit on fileHeating & cooling: Add Supply Ducting From An Exisitng Hvac Unit For (2) New Offices
  • 2024
    permit on fileHeating & cooling: Inspect Existing Airvent Which Was Relocated To Make Way For Some Framing For 1 Unit Room. Building Inspector Noted They Could Not Review Vent & Instead To Get Mechanical Inspector To Come Inspect.
  • 2022
    permit on fileElectrical: [Eplan] New Fire Aklarm System For Low Rise Apartment Building. Consists Of 1 Facp And 87 Fa Devics.
  • 2022
    permit on fileElectrical: Addition Of 40 Hp Fire Pump. ***Original: New Apartment Building 42 Units Mix Use. 1600 Amp Service. Plan Check For Power And Energy.
  • 2021
    permit on fileElectrical: New Apartment Building 42 Units Mix Use. 1600 Amp Service. Plan Check For Power And Energy.
  • 2021
    permit on fileElectrical: Install 4 Antennas One Communicaton Panel And 2 Control Devices (Das System)
  • 2020
    permit on fileElectrical: Conduit For Sump Pump
  • 2020
    permit on filePlumbing: Level Ii Methane Venting System.
  • 2020
    permit on filePlumbing: Plan Check For Duplex Sump Pump, Rainwater Drianage, And Subsurface Drainage Systems.
  • 2020
    permit on filePlumbing: New 42-Unit Six Level Appartment Building Over One Level Of Basement Parking Garage. Plan Check For Potable Water, Waste/Vent, Booster Pump, Low Pressure Fuel Gas, And Sewage Ejector Systems. 3-Inch Equiv Water Meter. 3-Inch Potable Water Service Line. Rp Backflow Device Is Required.
  • 2019
    permit on filePlumbing: Plumbing Permit · SCHON TEPLER CONSTRUCTION, INC
  • 2019
    permit on fileHeating & cooling: New 42-Unit Six Level Appartment Building Over One Level Of Basement · PROFESSIONAL MECHANICAL CONTRACTORS INC
  • 2019
    permit on file, unconfirmedElectrical: Electrical Permit · BURNS BRIAN
  • 2014
    permit on file, unconfirmedHeating & cooling: Hvac Permit · LINE ELECTRIC INC
  • 2014
    permit on file, unconfirmedElectrical: Electrical Permit · LINE ELECTRIC INC
  • 2014
    permit on fileHeating & cooling: Hvac Permit · LINE ELECTRIC INC

Manage this home to schedule a service or to update the timeline.