LAHomework Sign in
Los Angeles, CA 90034 · S Holt Ave

2810 S Holt Ave

Built 1935 · 744 sq ft
LOT 4,897 SQ FT · 2 STRUCTURES · APN 4312-003-003Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1935
Living area
744 sqft
Lot size
4,897 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
4312-003-003

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 89 homes on S Holt Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedElectrical: Install 400 Amp 2 Gang Meter Panel And Change The Old Service Panel To Sub Panel
  • 2024
    permit on fileElectrical: Install An Electrical Vehicle Charger(S) In A Single-Family Dwelling.
  • 2023
    permit on fileSolar: [Eplan] Pv1 Install New Solar. 7 Modules With Microinverters Roof Mounted- 2.73 Kwdc, 1.68 Kwac.
  • 2022
    permit on fileRoom addition: Convert Existing 1-Story Single Family Dwelling To Adu At Rear Of Lot. No Interior Or Exterior Proposed.2 Of 2
  • 2022
    permit on fileElectrical: Installation Of New 200A, 2 Meter Socket Panel Adjacent To Existing 100A Panel. Existing Panel Shall Remain In Place, Meter Socket Blanked Off And Will Serve As A Sub-Panel. (N) 200A Service Shall Feed Existing Panel For 2810 And 2808
  • 2022
    permit on filePlumbing: Relocation Of Underground Gas, Water And Sewer Line To Accomidate New Sfr (2810). Gas Shall Tie Into New Gas Meter Located On 2810 Holt, Sewer To Tie Into 2810 4" Line, Water Will Be Fed Off Its Own Water Meter In Parkstrip.
  • 2021
    permit on fileKitchen: Window (5) And Door Change-Out (1) (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All Residential Buildings, Three Stories Or Less, Per Section 150.2(B) 1B Of Title 24. (1
  • 2021
    permit on fileElectrical: Replacement Of All Outlets, Switches And Light Fixtures And Ceiling Fans. "Comply With Department Order Effective Date02/12/2021. Permit Will Expire 30 Days From Issuance Date".
  • 2021
    permit on filePlumbing: Replacement Of Existing Plumbing Fixtures. "Comply With Department Order Effective Date02/12/2021. Permit Will Expire 30 Days From Issuance Date".

Manage this home to schedule a service or to update the timeline.