LAHomework Sign in
Los Angeles, CA 90064 · Overland Ave

2757 Overland Ave

Built 1956 · 2,864 sq ft
LOT 8,042 SQ FT · 1 STRUCTURE · APN 4255-018-001Lot Structure
0 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1956
Living area
2,864 sqft
Lot size
8,042 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
3
Home type
Single-family
Parcel (APN)
4255-018-001

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2025
Expected 2045 to 2055From the 2025 permit
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterOn record 2025
Expected 2035 to 2040From the 2025 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 81 homes on Overland Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileGeneral remodel: Add Sill Plate Anchor Bolts And Plywood To Cripple Walls (If Existing) Per La City Standard Plan #1; No Foundation Replacement (Earthquake Hazard Reduction Per Chapter 92 Of The Los Angeles Building Code). (Houses, Residential Buildings Up To 3 Stories And Up To 4 Units).
  • 2025
    permit on fileRoof: "Comply With Department Order Effective Date06/30/2017. Permit Will Expire 30 Days From Issuance Date" Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing (25) Squares. Class A Roof Covering Is Required Within Very High Fire Hazard S
  • 2025
    permit on fileGeneral remodel: Remodel Existing 2 Story House. Remove Load Bearing Walls Per Plan. Add/Replace Windows And Exterior Door Of Different Sizes. Comply With Department Order Effective Date06/30/2017. Permit Will Expire 30 Days From Issuance Date
  • 2025
    permit on fileElectrical: Replace Existing 200A Panel. Replace All Existing Fixtures, Outlets And Switches. Install 15 New Circuits Throuhout The Home For Recessed Lights, Outlets, Appliances, And Ev Charger."Comply With Department Order Effective Date06/30/2017. Permit Will Expire 30 Days From Issuance Date".
  • 2025
    permit on fileWater heater: Remodel 4 Bathrooms, Laundry, And Kitchen. Replace Water Lines, Drain Lines, Gas Lines As Necessary. Replace All Existing Fixtures. No New Fixtures Added. Install New Outdoor Tankless Water Heater. New Eq Valve.
  • 2025
    permit on fileHeating & cooling: "Comply With Department Order Effective Date06/30/2017. Permit Will Expire 30 Days From Issuance Date". Replace Existing Condenser With Heat Pump. Replace Existing 4 Bath Fans, 1 Laundry Duct, And 1 Kitchen Exhaust. Combine With Building Permit # 25016-20000-09310
  • 2018
    permit on filePlumbing: Plumbing Permit · DRAIN RIGHT SERVICES INC
  • 2015
    permit on fileHeating & cooling: Hvac Permit · SERVICE AIR CONDITIONING INC

Manage this home to schedule a service or to update the timeline.