LAHomework Sign in
Los Angeles, CA 90064 · Malcolm Ave

2728 Malcolm Ave

Built 2005 · 3,598 sq ft
LOT 6,299 SQ FT · 1 STRUCTURE · APN 4255-017-019Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2005
Living area
3,598 sqft
Lot size
6,299 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
5
Home type
Single-family
Parcel (APN)
4255-017-019

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2025 to 2035From build year 2005
20262035
HVACWorth a look now
Usually done by 2025From build year 2005
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 107 homes on Malcolm Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileSolar: [Eplan] Install Of 3 Tesla Powerwalls 40.5 Kwh Ess. Existing Pv System.
  • 2024
    permit on fileElectrical: Main Panel Upgrade 200 Amp / Sub Panel 225/200 Amp /Concrete Pad For Ess 3Ftx3Ft
  • 2023
    permit on file, unconfirmedHeating & cooling: Replace 2-Ton Minisplit (2 Zones) - Left Side Yard
  • 2014
    permit on file, unconfirmedSolar: Install Roof Mounted Solar Pannels With A Single Inverter Ungrounded S · SOLARCITY CORPORATION

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2025
  • Now
    Roof replacementExpected 2025 to 2035