LAHomework Sign in
Los Angeles, CA 90031 · Alta St

2712 Alta St

Built 1910 · 1,006 sq ft
LOT 7,410 SQ FT · 1 STRUCTURE · APN 5208-023-013Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1910
Living area
1,006 sqft
Lot size
7,410 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
5208-023-013

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2021
Expected 2041 to 2051From the 2021 permit
HVACOn record 2013
Expected 2028 to 2033From the 2013 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 87 homes on Alta St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedGeneral remodel: "Comply With Department Order Effective Date03/31/2022. Permit Will Expire 30 Days From Issuance Date". Complete Work Done Under Previously Expired Permit #22014-10000-02873. Work Is 90_% Complete(Minimum 75% Percent Completed As Determined By Inspection).(Single Inspection; Two Inspections If Combi
  • 2025
    permit on filePlumbing: Remove The Old Dishwasher And Install A New
  • 2024
    permit on file, unconfirmedElectrical: Upgrade Main Panel To 2-Gang, Servicing 2712 Alta St And Adu 2712 1/2 Alta St "Comply With Department Order Effective Date 03/31/2022. Permit Will Expire 30 Days From Issuance Date"
  • 2024
    permit on file, unconfirmedElectrical: Temporary Power Pole"Comply With Department Order Effective Date03/31/2022. Permit Will Expire 30 Days From Issuance Date"
  • 2024
    permit on filePlumbing: Install New Hose Bibb "Comply With Department Order Effective Date 03/31/2022. Permit Will Expire 30 Days From Issuance Date"
  • 2023
    permit on file, unconfirmedRoom addition: Eplan Convert Portion Of Existing Basement And Addition To Create An Accessory Dwelling Unit Per Ordinance, Scope To Also Include Addition To Existing Signle Family Dwelling, Exterior Deck, And Complete Interior Remodel. ***Bldg Reqd To Be Fire Sprinklered Per Nfpa 13D***
  • 2021
    permit on fileRoof: Reroof With 24 Sqrs Comp Shingle Roofing Over New Solid Sheathing.Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labeled And Certified By Cool Roof Rating Council (Crrc). Cool Roof May
  • 2013
    permit on fileHeating & cooling: Hvac Permit · MARAVILLA FOUNDATION

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2028
    HVAC replacementExpected 2028 to 2033