LAHomework Sign in
Carson, CA 90810 · E Monroe St

2711 E Monroe St

Built 1942 · 1,002 sq ft
LOT 5,609 SQ FT · 2 STRUCTURES · APN 7308-015-023Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1942
Living area
1,002 sqft
Lot size
5,609 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
7308-015-023

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterOn record 2024
Expected 2034 to 2039From the 2024 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 93 homes on E Monroe St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedHeating & cooling: N Pool 200 Sq Ft, 1 N Gfci Outlet (1) Furnace Up To 100,000 Btu
  • 2025
    permit on file, unconfirmedElectrical: N Pool 200 Sq Ft, 1 N Gfci Outlet (1) Outlet Box - Receptacles
  • 2025
    permit on filePool: (N) Heated 200 Sqft Pool.
  • 2024
    permit on fileElectrical: Remodel To A 1-Story Sfr To Convert Kitchen And Dining Rm Area Into A Bedroom And Bathroom -Remove Load Bearing Wall To Create An Open Floor Plan- -Close Off Front Window -Replace All Windows -New Ac Unit -New Water Heater -Rewire -Repipe And Bathroom Remodel.
  • 2024
    permit on fileWater heater: Remodel To A 1-Story Sfr To Convert Kitchen And Dining Rm Area Into A Bedroom And Bathroom -Remove Load Bearing Wall To Create An Open Floor Plan- -Close Off Front Window -Replace All Windows -New Ac Unit -New Water Heater -Rewire -Repipe And Bathroom Remodel.
  • 2024
    permit on fileHeating & cooling: Remodel To A 1-Story Sfr To Convert Kitchen And Dining Rm Area Into A Bedroom And Bathroom -Remove Load Bearing Wall To Create An Open Floor Plan- -Close Off Front Window -Replace All Windows -New Ac Unit -New Water Heater -Rewire -Repipe And Bathroom Remodel.
  • 2024
    permit on fileRoom addition: Remodel To A 1-Story Sfr To Convert Kitchen And Dining Rm Area Into A Bedroom And Bathroom -Remove Load Bearing Wall To Create An Open Floor Plan- -Close Off Front Window -Replace All Windows -New Ac Unit -New Water Heater -Rewire -Repipe And Bathroom Remodel.

Manage this home to schedule a service or to update the timeline.