LAHomework Sign in
Santa Monica, CA 90405 · 32nd St

2645 32nd St

Built 2019 · 6,740 sq ft
LOT 6,370 SQ FT · 2 STRUCTURES · APN 4270-019-016Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2019
Living area
6,740 sqft
Lot size
6,370 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
4270-019-016

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
Water heaterComing up
Expected 2029 to 2034From build year 2019
20262035
See 2 more systems expected later
RoofLater
Expected 2039 to 2049Original, built 2019
HVACLater
Expected 2034 to 2039Original, built 2019
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 76 homes on 32nd St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on fileElectrical: Installation Of Two (2) Tesla Powerwall Energy Storage System On The Exterior Of A Single-Family Residence.
  • 2020
    permit on filePool: Construction Of New Pool, Pool Cover, And Water Feature At Single Family Residence.
  • 2018
    permit on fileElectrical: (1) 100Amp Temp. Power Pole.
  • 2018
    permit on fileSolar: New Three Story Single Family Residence (Basement + 2 Above Grade Stories). New Landscaping With Automatic Irrigation System. New Driveway, Walkways And Patios. New In-Ground Pool (Under Separate Permit.) New Solid Fencing Around Perimeter Of Property (Under Separate Permit). New Roof-Mounted Solar

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2029
    Water heater replacementExpected 2029 to 2034