LAHomework Sign in
Los Angeles, CA 90731 · S Denison Ave

2612 S Denison Ave

Built 1969 · 1,487 sq ft
LOT 2,488 SQ FT · 1 STRUCTURE · APN 7465-012-030Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1969
Living area
1,487 sqft
Lot size
2,488 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
7465-012-030

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2026
Expected 2046 to 2056From the 2026 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 170 homes on S Denison Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 15 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Pro
  • 2023
    permit on filePlumbing: Installation Of A Water Filtration System.
  • 2021
    permit on fileElectrical: I Recently Purchased My Home At 2612 S Denison Ave. Per The Inspection Report, It Is Recommended That I Immediately Upgrade My Main Electrical Panel As It Is Worn/Weathered And Does Not Supply The Required Amount Of Voltage. (The Manufacture Of Panel Is A Brand Known For Frequent Issues As Well.) I
  • 2015
    permit on fileElectrical: Electrical Permit · OWNER-BUILDER

Manage this home to schedule a service or to update the timeline.