LAHomework Sign in
Stevenson Ranch, CA 91381 · Franklin Ln

26034 Franklin Ln

Built 1993 · 3,317 sq ft
LOT 7,866 SQ FT · 1 STRUCTURE · APN 2826-057-021Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1993
Living area
3,317 sqft
Lot size
7,866 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
2826-057-021

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Usually done by 2023From build year 1993
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 23 homes on Franklin Ln →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileBathrooms: 22 Windows Changeout (Dinning Rm, Family Rm, Living Rm, Laundry Rm, Stairs, Guest Rm, 2 Rooms, Master Bedroom And Bath) 1 Patio Door Changeout At Rear
  • 2022
    permit on filePool: (E) Pool/Spa Remodel. Adding Grotto To (E) Pool, Increasing Pool Depth To 8'.
  • 2022
    permit on fileSolar: Install Roof Mounted Pv System On Residence - 10.875 Kw, 25 Modules, 519.5 Sf
  • 2022
    permit on fileElectrical: Installation Of (2) 6.8Kw Sunpower Energy Storage System
  • 2020
    permit on fileElectrical: Replace Damaged 200Amp Panel With (N) 200Amp Panel

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementUsually done by 2023